Mohamed El Rouby

Mechanical Construction Manager Metro Riyadh Project
Mechanical Construction Manager Metro Riyadh Project
  • Riyadh, Saudi Arabia
  • March 4, 2021

1
Curriculum Vitae
MOHAMED SALAH EL ROUBY
Al Qashahya St-Nada District/Al Riyadh/KSA
Eng.mselrouby@gmail.com
Mobile: +966-50-313-6010
Nationality: Egyptian
Date of Birth: 01/10/1990
Relationship status: Married
Iqama Status: Transferable
CAREER OBJECTIVE
To become a registered professional Construction Manager with extensive background and experience in a challenging and professional environment like multinational Construction Companies. Also, to support organization to achieve their goal &profit based on my different field experience in construction field such as (Construction site Work, Planning, MEP Quantity Surveying, Cost Control, Procurement, etc.) and to have well identified &stable career path.
EDUCATION
Faculty of Engineering – Cairo University
Bachelor in Mechanical Engineering (2007 – 2012)
Cumulative Grade: Good (73 %)
Graduation project: HVAC & Plumbing System for Hospital
Graduation project grade: Excellent
COURSES& Certification
PMP Certified ® Number: 2777913 Jul-2020
HVAC at Ain Shams University - Faculty of Engineering (2014)
Firefighting at Ain Shams University - Faculty of Engineering (2014)
EMPLOYMENT

Employed in Samsung C&T Engineering & Construction Group– as Senior Mechanical Construction Engineer
Railway MEP at Metro Riyadh Project (Dec/2014 – Present)
2
Testing & Commissioning Senior Mechanical Engineer Riyadh Metro Line 4 (Nov 2019 –Present) • Prepare the Commissioning Plan • Prepare Testing& Commissioning schedule according to Testing& Commissioning Plan • Follow up monitoring & Controlling the Commissioning activity Progress and update the Testing& Commissioning schedule progress Report • Responsible for witness, inspection, coordination and commissioning for all mechanical systems in line 4 • Responsible for monitoring construction team for all mechanical system ( HVAC , Firefighting , plumbing , Infrastructure , Irrigation system and water features • Start up ,pre-commissioning, commissioning, Functional test & Testing & Balancing (TAB) of all Mechanical Systems • Coordinate the Testing& Commissioning process with all vendors, suppliers& subcontractors • Prepare the inspection status& progress reports of the site during construction & commissioning phase. • Arrange Work permits on the track with transit system • Conduct Coordination meeting between different entities (Civil, Archi, Transit system) for the work required permits and approvals • Detect figure out, analyze & Resolve clashes define priorities with respect to T&C overall project • Equipment problem configuration & troubleshooting • Lead Testing& Commissioning Meeting • Supporting T&C manager in his tasks (review assignment, give recommendations, external meeting participation, configuration management & defining KPI (Key performance Index) • Prepare commissioning Method statement, Test Procedures & Startup Reports of all mechanical equipment. Support T&C Team in Establish IRN, TRR, and IAT Plus follow up processing • Coordinate& conduct training with handling the systems to O&M Company (FLOW consortium at Line 4) participate in the Gap analysis & reflect the data in data base in Maximo software • Handling Demonstration for Testing & Commissioning Mechanical System in line 4 with Consortium management (PMs & PDs) plus the client Site (Ramped Consultant & RCRC Owner) •Review & prepare action plan for project close-out & documents
Senior Mechanical Construction Engineer Depot 4/6 (Feb 2017 – Nov 2019)
• Liaising with the consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. • Day-to-day management of the site, including supervising and monitoring the site labor force and the work of subcontractors. •Execution for Mechanical Tasks (HVAC, Firefighting & Plumbing) as per the planned schedule and deliver on time • Review the design drawing and submit CRS (Comments Resolution Sheet). • Arrange the shop drawing and submit it for approvals. • Arrange all material and MAR (Material Approval Request). • Preparing installation Method of Statement (MOS). • Installation of all Mechanical systems on Line-4 HVAC (Ducting, Fans, Equipment, AHU, FCU, HTP), Fire Fighting and Plumbing) • Work in Depot 4/6 for all mechanical activities, coordinate with the client Consultant& owner (Ramped, RCRC) plus internal & External Entities (Civil, Archi, TSY..) to meet their requirements and achieve satisfaction for successful Handover &operation • Quantity surveying issuing BOQ & Submitting PR for the required Materials • verify subcontractors Invoices as per the contract BOQ & Work done on site
3
Project Control Mechanical Engineer & Site Supervision Line4 (Dec 2014 – Feb 2017)
• Working on Metro Riyadh Project as Samsung C&T Site Mechanical Engineer for Line-4 as part of FAST Consortium (CJV) (Construction Joint Venture). • Working on Line-4 CJV (Construction Joint Venture) M&E Department As project Control Engineer • Responsible for Depot, Viaduct, Elevated Stations, At Grade, Underground stations and Tunnels. • Preparing BOQ for subcontractor bidding MEP equipment. • Preparing the main schedule for MEP Activities in line 4 Mechanical. • Preparing Tender Documents for Subcontractors. • Handling Cost Control for Mechanical Work (BOQ, Pricing, Schedule). • Subcontractors controlling (Schedule, Execution, Material, Cost Controlling, Invoices) • Dealing with Client side (Consultant & Owner) finalizing Technical& Commercial Issues. • Responsible for PCC (Program Cost Control) Oracle System. •Day-to-day management of the site, including supervising and monitoring the site labor force and the work of subcontractors. •Responsible for PCC (Program Cost Control) Oracle System.




Employed in CCC – Consolidated Contractors Company as Technical Office Power Plant Mechanical Engineer Athens Branch (APR 2013 – Dec 2014)
Job Description:
• Receiving the Tender Documents issued by Client or Consultant and make analysis of all Systems of Power Plants for the project. • Conducting all bidding Procedures (Technical & Commercial) • Preparing BOD (Basis of Design) for all Mechanical Systems of Power Plants, HVAC design, pipeline design procedures (sizing, material selection, valves, and fitting). • Making PFD’s (Process Flow Diagrams), PID’s (Piping and Instrumentation Diagrams) for all Systems of Power Plants. • Preparing RFQ’s (Request for Quotations) and submitted to subcontractors and suppliers. • Accurate revision of designs submitted by subcontractors and screening received offers. • Finalizing the Tender Documents and submitted to the Client (Technical & Commercial)

Employed in (EGAT – Egyptian German Air Treatment as HVAC Designer and Sales Engineer
(Sep2012-Apr 2013)
4
Job Description:
• Supervision of manufacturing the all components of air handling unit (Casing, Mixing Boxes, Fans, Filters, etc.) plus Ducting and Duct Accessories (Dampers, Diffusers, Registers, Grills, etc..) • Full design for Heating, Ventilation and Air Conditioning for various Projects plus Construction Work. • Sales Engineer for HVAC Equipment for Mall of Egypt with Main Contractors Orascom& Bisix. • Sales Engineer for HVAC Equipment for New Egyptian Museum with Main Contractors Orascom & Bisix. • Site and Sales Engineer for Heliopolis Hospital HVAC Equipment.
TECHNICAL SKILLS
Microsoft (Excel, Word, Power Point)
EPC (Engineering Procurement and Construction)
DRAWING & DETAILING (AUTOCAD)
MATLAB
IPC Cost Program
SOFT SKILLS
Technical writing
Presentation skills
Team Management
Leadership skills
Meeting Management
Political awareness for Organization Structure
Communication
Problem solving
Learning new concepts quickly
Initiative
Team Oriented
Negotiation Skills
LANGUAGE
English: Writing, Speaking, and Reading: Excellent
REFERENCES
References are available upon request

E-mail
eng.mselrouby@gmail.com
Phone Number
00966503136010

Contact Candidate

Contact
Back to top button

Adblock Detected

Please consider supporting us by disabling your ad blocker