CAREER OBJECTIVE
To become a registered professional Construction Manager with extensive background and experience in a challenging and professional environment like multinational Construction Companies. Also, to support organization to achieve their goal &profit based on my different field experience in construction field such as (Construction site Work, Planning, MEP Quantity Surveying, Cost Control, Procurement, etc.) and to have well identified &stable career path.
EDUCATION
Faculty of Engineering – Cairo University
Bachelor in Mechanical Engineering (2007 – 2012)
Cumulative Grade: Good (73 %)
Graduation project: HVAC & Plumbing System for Hospital
Graduation project grade: Excellent
COURSES& Certification
PMP Certified ® Number: 2777913 Jul-2020
HVAC at Ain Shams University - Faculty of Engineering (2014)
Firefighting at Ain Shams University - Faculty of Engineering (2014)
EMPLOYMENT
Employed in Samsung C&T Engineering & Construction Group– as Senior Mechanical Construction Engineer
Railway MEP at Metro Riyadh Project (Dec/2014 – Present)
2
Testing & Commissioning Senior Mechanical Engineer Riyadh Metro Line 4 (Nov 2019 –Present) • Prepare the Commissioning Plan • Prepare Testing& Commissioning schedule according to Testing& Commissioning Plan • Follow up monitoring & Controlling the Commissioning activity Progress and update the Testing& Commissioning schedule progress Report • Responsible for witness, inspection, coordination and commissioning for all mechanical systems in line 4 • Responsible for monitoring construction team for all mechanical system ( HVAC , Firefighting , plumbing , Infrastructure , Irrigation system and water features • Start up ,pre-commissioning, commissioning, Functional test & Testing & Balancing (TAB) of all Mechanical Systems • Coordinate the Testing& Commissioning process with all vendors, suppliers& subcontractors • Prepare the inspection status& progress reports of the site during construction & commissioning phase. • Arrange Work permits on the track with transit system • Conduct Coordination meeting between different entities (Civil, Archi, Transit system) for the work required permits and approvals • Detect figure out, analyze & Resolve clashes define priorities with respect to T&C overall project • Equipment problem configuration & troubleshooting • Lead Testing& Commissioning Meeting • Supporting T&C manager in his tasks (review assignment, give recommendations, external meeting participation, configuration management & defining KPI (Key performance Index) • Prepare commissioning Method statement, Test Procedures & Startup Reports of all mechanical equipment. Support T&C Team in Establish IRN, TRR, and IAT Plus follow up processing • Coordinate& conduct training with handling the systems to O&M Company (FLOW consortium at Line 4) participate in the Gap analysis & reflect the data in data base in Maximo software • Handling Demonstration for Testing & Commissioning Mechanical System in line 4 with Consortium management (PMs & PDs) plus the client Site (Ramped Consultant & RCRC Owner) •Review & prepare action plan for project close-out & documents
Senior Mechanical Construction Engineer Depot 4/6 (Feb 2017 – Nov 2019)
• Liaising with the consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. • Day-to-day management of the site, including supervising and monitoring the site labor force and the work of subcontractors. •Execution for Mechanical Tasks (HVAC, Firefighting & Plumbing) as per the planned schedule and deliver on time • Review the design drawing and submit CRS (Comments Resolution Sheet). • Arrange the shop drawing and submit it for approvals. • Arrange all material and MAR (Material Approval Request). • Preparing installation Method of Statement (MOS). • Installation of all Mechanical systems on Line-4 HVAC (Ducting, Fans, Equipment, AHU, FCU, HTP), Fire Fighting and Plumbing) • Work in Depot 4/6 for all mechanical activities, coordinate with the client Consultant& owner (Ramped, RCRC) plus internal & External Entities (Civil, Archi, TSY..) to meet their requirements and achieve satisfaction for successful Handover &operation • Quantity surveying issuing BOQ & Submitting PR for the required Materials • verify subcontractors Invoices as per the contract BOQ & Work done on site
3
Project Control Mechanical Engineer & Site Supervision Line4 (Dec 2014 – Feb 2017)
• Working on Metro Riyadh Project as Samsung C&T Site Mechanical Engineer for Line-4 as part of FAST Consortium (CJV) (Construction Joint Venture). • Working on Line-4 CJV (Construction Joint Venture) M&E Department As project Control Engineer • Responsible for Depot, Viaduct, Elevated Stations, At Grade, Underground stations and Tunnels. • Preparing BOQ for subcontractor bidding MEP equipment. • Preparing the main schedule for MEP Activities in line 4 Mechanical. • Preparing Tender Documents for Subcontractors. • Handling Cost Control for Mechanical Work (BOQ, Pricing, Schedule). • Subcontractors controlling (Schedule, Execution, Material, Cost Controlling, Invoices) • Dealing with Client side (Consultant & Owner) finalizing Technical& Commercial Issues. • Responsible for PCC (Program Cost Control) Oracle System. •Day-to-day management of the site, including supervising and monitoring the site labor force and the work of subcontractors. •Responsible for PCC (Program Cost Control) Oracle System.
Employed in CCC – Consolidated Contractors Company as Technical Office Power Plant Mechanical Engineer Athens Branch (APR 2013 – Dec 2014)
Job Description:
• Receiving the Tender Documents issued by Client or Consultant and make analysis of all Systems of Power Plants for the project. • Conducting all bidding Procedures (Technical & Commercial) • Preparing BOD (Basis of Design) for all Mechanical Systems of Power Plants, HVAC design, pipeline design procedures (sizing, material selection, valves, and fitting). • Making PFD’s (Process Flow Diagrams), PID’s (Piping and Instrumentation Diagrams) for all Systems of Power Plants. • Preparing RFQ’s (Request for Quotations) and submitted to subcontractors and suppliers. • Accurate revision of designs submitted by subcontractors and screening received offers. • Finalizing the Tender Documents and submitted to the Client (Technical & Commercial)
Employed in (EGAT – Egyptian German Air Treatment as HVAC Designer and Sales Engineer
(Sep2012-Apr 2013)
4
Job Description:
• Supervision of manufacturing the all components of air handling unit (Casing, Mixing Boxes, Fans, Filters, etc.) plus Ducting and Duct Accessories (Dampers, Diffusers, Registers, Grills, etc..) • Full design for Heating, Ventilation and Air Conditioning for various Projects plus Construction Work. • Sales Engineer for HVAC Equipment for Mall of Egypt with Main Contractors Orascom& Bisix. • Sales Engineer for HVAC Equipment for New Egyptian Museum with Main Contractors Orascom & Bisix. • Site and Sales Engineer for Heliopolis Hospital HVAC Equipment.
TECHNICAL SKILLS
Microsoft (Excel, Word, Power Point)
EPC (Engineering Procurement and Construction)
DRAWING & DETAILING (AUTOCAD)
MATLAB
IPC Cost Program
SOFT SKILLS
Technical writing
Presentation skills
Team Management
Leadership skills
Meeting Management
Political awareness for Organization Structure
Communication
Problem solving
Learning new concepts quickly
Initiative
Team Oriented
Negotiation Skills
LANGUAGE
English: Writing, Speaking, and Reading: Excellent
REFERENCES
References are available upon request